• PROJECT
  • LOCATION
  • M2 OF CONSTRUCTION
  • CLIENT
  • START OF WORK
  • WORK COMPLETION
  • PROJECT DESCRIPTION
  • PARQUE INDUSTRIAL SJR SECTOR INDUSTRIAL
  • Calle sin nombre # 50,colonia el mirador, San Juan del Rio Quéretaro
  • 17, 359.35m2
  • ADVANCE BP S. DE R.L. DE C.V.
  • JANUARY 2017
  • AUGUST 2018
  • Industrial park with a warehouse for rent equipped with infrastructure of PCI, domestic water, electricity in medium and low voltage, system rainwater with concrete channels; construction system based on rigid frame metal structure; joist-based cover prefabricated, equipped with substation, treatment plant, ground access and header works

  • See video