• PROJECT
  • LOCATION
  • M2 OF CONSTRUCTION
  • ESPEC 1
  • ESPEC 2
  • CLIENT
  • START OF WORK
  • WORK COMPLETION
  • PROJECT DESCRIPTION
  • SPEC 1 Y 2 PTO INTERIOR
  • Mina Calderones 200, Santa Fe III, Puerto Interior, 36275 Silao, Gto.
  • 29,378
  • 10,817
  • 18,561
  • Advance Real Estate 2 S. de R.L. de C.V
  • NOVEMBER 2018
  • JULY 2019
  • Complex of two industrial warehouses for rent equipped with PCI infrastructure, domestic water, electricity in medium and low tension, rainwater system with concrete channels; construction system based on a metal structure of rigid frames; cover based on prefabricated joist and laminate cover KR 18 with insulation of fiberglass
  • Ver video