- PROJECT
- LOCATION
-
M2 OF CONSTRUCTION
- ESPEC 1
- ESPEC 2
-
CLIENT
- START OF WORK
-
WORK COMPLETION
- PROJECT DESCRIPTION
- SPEC 1 Y 2 PTO INTERIOR
- Mina Calderones 200, Santa Fe III, Puerto Interior, 36275 Silao,
Gto.
- 29,378
- 10,817
- 18,561
- Advance Real Estate 2 S. de R.L. de C.V
- NOVEMBER 2018
- JULY 2019
-
Complex of two industrial warehouses for rent equipped with
PCI infrastructure, domestic water, electricity in medium and low
tension, rainwater system with concrete channels; construction system
based on a metal structure of rigid frames; cover based on
prefabricated joist and laminate cover KR 18 with insulation of
fiberglass
- Ver video