We understand the vision of our clients, ARQUIND MX analyzes each of the processes to achieve efficient productions, creating a "start-up" plan by means of our STRATEGIC PLANNING MANAGEMENT, using logistics processes, and technological tools in design and during the execution, successfully achieving the commissioning of Manufacturing or production operations.
At Arquitectura Industrial de México, we manage, supervise and
we control all
Electromechanical Engineering projects, carried out for the necessary facilities that
require start-up within each industrial process. TENANT IMPROVEMENTS (IT)
° BIG DATA
° Automation and industrial control.
°
Air Extraction and Injection.
° HVAC.
°
Fire protection system.
°Process Water.
°
Electromechanical.
°
Compressed air.
°
Traveling Crane / Hoists
°
Engineering Crossing in BIM + LOD 350 - 500
°
Supervision and control.
° Shillers for Processes
.
°
Frozen water.
°
Selvedge Cutting System.
° Scrap Conveyors & Shakers.
°
Measurement and Control Laboratories.
°
Supervision and Installation of Machinery
In Arquitectura Industrial de México, we logistically control and
We supervise the works for the necessary Machinery and Equipment installations.
TENANT IMPROVEMENTS (IT)
° Control of Contractors, Operators
° Engineering Crossing in BIM + LOD 350 - 500
° Implementation of IT Installations Program
° Facilities Supervision IT Specialists
° Assembly Program
° Landing Logistics
° Facility Logistics
° Safety and Hygiene Report
° TIME Lapse 27/7 monitoring
° Security and access control.
° Inventory and Daily Report.
° Assembly documentation and PROCORE acceptance
° COORDINATION of Cranes, lifting platforms, etc.
° Modifications and extensions of existing facilities
° Nondestructive verification (X rays, etc.)
At Arquitectura Industrial de México, We Supervise and verify the
work carried out by specialists in Machinery and Equipment facilities
Necessary for Commissioning and Start of Operations.
FACILITIES MANAGEMENT (IT)
° CONTROL AND COORDINATION OF INSTALLATIONS (IT)
° Installation management according to program.
° Compliance with the assigned times.
° Logistics and Machinery Installation Accommodation
° Production Equipment Installation Monitoring
° Measurement and Control Laboratories.
° Supervision and Installation of Machinery
° Equipment Testing
° Start-up testing and analysis of Production Lines.
° Highly Qualified Supervisors within Facilities Management.
° Graphic and visual Daily Report.
° MANAGEMENT OF PROCESSES AND APPROVALS BY PROCORE.
In Industrial Architecture of Mexico, Our Main Objective
is the Authorization by government institutions and Civil Protection to
the Start of Operations and Commissioning.
° Industrial Business Feasibility. for
° Internal civil protection folder
° Signs and Emergency Equipment
° Internal civil protection program
° Certification of Drills
° Certifications to emergency brigades. for
° Issuance of structural opinion of the property
° Issuance of electrical opinion of facilities
° Certification of Equipment before the Secretary of Labor
° Certification of Operators before the Secretary of Labor
° Project review for compliance with Civil Protection. for
° Authorization of Exterior Sign.
° OBTAINING A GOOD VIEW OF CIVIL PROTECTION
° OBTAINING A OPERATING LICENSE
° RENEWAL OF OPERATING LICENSE